Projects
System Installation
Remote Fertigation System Installation
This project involved the installation of a generator-driven FertiOne™ fertigation system, designed to operate reliably in a remote location where consistent performance is critical.
Delivered through strong teamwork and coordination, the project included:
- Shed construction completed by Kane Arthur Building
- Pipework and system installation carried out by JP
- Electrical fit-out and commissioning completed by our newest electrician, Finn
The result is a tidy, efficient fertigation setup built to perform in demanding conditions – another quality installation delivered by the Liquid Action team.
Dam Fill & Pumping System
Birch Hill Dam Fill & Pumping System
Liquid Action was proud to be involved in the filling of the Birch Hill Dam, delivering a high-capacity water transfer solution designed for efficiency and control.
The system achieved a flow rate of 395 m³ per hour, delivered through a 315mm PE fill pipeline, ensuring rapid and reliable dam filling while maintaining system integrity.
This project highlights our capability to manage large-scale irrigation infrastructure and deliver precise, high-performance outcomes in challenging environments — another standout project completed by the Liquid Action team.